DENVER WATER - ATHMAR PARK (PART 1 & 2)
CLIENT Denver Water
SIZE Phase 1: 4,512 Total LF | Phase 2: 3,191 Total LF COMPLETION 2022
DENVER, CO
R&R provided topographic survey design and mapping for a total of 9 segments divided into two phases in the Athmar Park neighborhood in Denver. The project upgraded and replaced certain sections of the aging water line. The total linear feet surveyed was over 7,700 feet.
The segments in Part 1 included (4,512 Total LF):
Segment 1: W. Gill Pl. from S. Zuni St. to S Tejon S. St.
Segment 2: S. Tejon St. from W. Gill Pl. to W. Kentucky Ave.
Segment 3: S. Vallejo St. From W. Exposition Ave. to W. Ohio Ave.
Segment 4: W. Ohio Ave. from S. Vallejo St. To S. Zuni St.
The Segments in Part 2 included (3,191 Total LF):
Segment 1: W. Virginia Ave. from S. Tejon St. to S. Shoshone St.
Segment 2: S. Shoshone St. from W. Virginia Ave. to W. Center Ave.
Segment 3: W. Center Ave. from S. Shoshone St. to W. Exposition Ave.
Segment 4: S. Quivas St. from W. Virginia Ave. to S. Quieto Way
Segment 5: S. Pecos St. from W. Exposition Ave. to W. Ohio Ave.