CARROLL COLLEGE PHASE I NELSON STADIUM





CLIENT Dick Anderson Construction
SIZE ~3.8 acres
COMPLETION 2024
HELENA, MT
Uniting our owner’s rep with a longtime client and skilled local contractor, R&R lent our expertise to supply a two-layer synthetic turf base and site installation for the state-of-the-art new football stadium field.
Nelson Stadium was designed to allow for multiple sport uses including soccer and softball. The retaining wall/backstop configuration can be seen in the top left corner of the field.